Mumbai, October 15 2026.
GEON, the future technologies division of KabraExtrusiontechnik Ltd, has successfully executed and commissioned a 10 MW/20 MWh Battery Energy Storage System (BESS) project in Jaisalmer, Rajasthan, on an Engineering, Procurement, and Construction (EPC) basis. The project supports the development of reliable and scalable energy storage solutions for India’s evolving energy needs.
Executed in accordance with the Rajasthan Integrated Clean Energy Policy, 2024, the project encompassed detailed engineering and design, procurement and supply of equipment, installation, testing, and commissioning.
With a power capacity of 10 MW and an energy storage capacity of 20 MWh, the BESS is designed to support efficient energy management, enhance grid stability and facilitate the effective integration of renewable energy into the power network. As India continues to expand its renewable energy capacity, battery energy storage systems are becoming increasingly important in addressing the variability of renewable power generation and enabling a more flexible and reliable electricity grid.
Commenting on the development, Anand Kabra, Chairman and Managing Director, GEON, said, “Having already executed projects of this nature, the commissioning of our 10 MW/20 MWh BESS project in Jaisalmer builds on our experience in delivering utility-scale energy storage solutions. Each project brings its own technical and operational considerations, and our focus has been on ensuring that the system is equipped to meet the demands of real-world energy infrastructure. With renewable energy capacity continuing to expand, we see battery storage playing an increasingly important role in making clean power more dependable and usable. At GEON, we are focused on building on our project experience to deliver storage solutions that address these volving requirements.”
The successful commissioning further strengthens GEON’s position in the energy storage and renewable energy sector, demonstrating its ability to execute utility-scale BESS projects on a turnkey EPC basis. The development also highlights the growing role of energy storage infrastructure in supporting India’s grid modernisation initiatives and advancing the objectives of its clean energy transition.